Updates

Tuesday, July 30, 2019

Ezigrade 4.0.0.84

›
We have added in a structure called an "Outlet". This is a simplified drain used in conjunction with the AllWay grading. You can s...
Friday, July 5, 2019

CDS 2.8.0.69

›
When exporting job to dwg/dxf and doing by "layer with point". Now separate entities such as heights, codes etc go on there own la...
Tuesday, July 2, 2019

4.0.0.83

›
Have added in a "stop bank". When running Allway grading - it stops the water flowing out along this edge of the triangles. All re...

Ezigrade 4.0.0.83

›
The QAT (Quick Access Toolbar) has been updated so that user can customise it. Look towards the right hand end and you will see the c...
Tuesday, June 4, 2019

CDS 2.8.0.68

›
If you have the "String Add" dialog open. You can calculate new points using the Cogo routines and the new points are automaticall...
Monday, June 3, 2019

Ezigrade 4.0.74

›
Importing Eesri shape files: We can now import design heights as well if the shape file contains them. Polyline shape files can now be i...
Thursday, May 16, 2019

Ezigrade 4.0.74

›
Drain Volumes: Are now always reported to the natural surface; even if the design was based on the design surface. In the field when build...
‹
›
Home
View web version

About Me

Foresoft
View my complete profile
Powered by Blogger.