Friday, May 22, 2015
CDS 2.6.0.13 and Ezigrade
Feature added that allows one to switch seamlessly between running a job in CDS and then running the job in Ezigrade. If you are in running a job in CDS2 then from "file menu - close and open in ezigrade" then job is opened within Ezigrade. If Ezigrade is not running then it is started up. If it is already running the job is opened with the current instance of Ezigrade. This also works when going from Ezigrade to CDS2.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment