Thursday, June 25, 2015
Ezigrade 2.0.49
Ezigrade now includes the option to put out strings to the Trimble Field level II controller. This is handy for Civil Engineering type as you can see on the screen edge of drains, edge of roads, ring tanks etc. At present can't put out both strings and section edges together - maybe next update.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment